Leeann Greenhouse

Watch a video on Facebook of the construction from beginning to end, plus some sweet music. Just click on the below link.

11/07/2019 – Night Lights

The below images are different exposures taken at night with a halogen lamp on the inside. Much more needs to be done towards completion, but for the present, this will be Leeann’s view every night from atop her deck.

10/31/2019 – Front siding and window installed

Almost complete… plus one pic from the inside looking towards the rear wall inside.

10/30/2019 – Another Stained Glass Window!

Siding on the back wall and installation of the diagonal grid stained-glass window. More detailed trim will fill it out nicely.

back wall sided

10/26/2019 – Roof windows on left side.

The pattern has emerged, now to the right side of this puzzle!

10/13/2019 – Rolling Them Trusses

Got the trusses up and cased the teak-framed, leaded-glass vintage windows. Things are taking shape!

10/12/2019 – Two leaded-glass windows that I framed with teak.

10/08/2019
Getting the walls weathered in before the roof goes on.

leeann oct 08

09/10/2019 – Work in progress
This one, a 10 X12 in Vancouver, Washington, has a brick foundation with all glass surroundings when completed. Stay tuned!

leeann phase 1